Laying Advice
Installation requires proper preparation, including:
• Measure the area and plan drainage with appropriate falls.
• Dig out the substrate to a depth of 220-230 mm.
• Prepare the sub-base with 150 mm of compacted MOT Type-1 hardcore.
• Mix and blend packs to ensure even color distribution.
• Apply priming slurry to improve bonding and prevent moisture transfer.
• Lay on a full mortar bed (50 mm depth).
• Allow 24 hours of curing time before grouting.
• Use an appropriate jointing compound for pointing.
• Consider applying a sealant for additional protection.
Care & Maintenance
To protect and maintain your paving:
• Regularly sweep to remove debris, especially during autumn.
• Perform periodic washing with appropriate stone cleaners.
• Avoid harsh cleaning chemicals that may damage the stone.
• Consider sealing the paving to protect against staining.
• Clean spills promptly to prevent staining.
• Use low-pressure washing to avoid damaging the surface.
• Inspect and maintain joints regularly.
Â