100% Genuine Stones of Best Quality available to Retail Users.

care & maintenance

Laying Advice

Installation requires proper preparation, including:

• Measure the area and plan drainage with appropriate falls.

• Dig out the substrate to a depth of 220-230 mm.

• Prepare the sub-base with 150 mm of compacted MOT Type-1 hardcore.

• Mix and blend packs to ensure even color distribution.

• Apply priming slurry to improve bonding and prevent moisture transfer.

• Lay on a full mortar bed (50 mm depth).

• Allow 24 hours of curing time before grouting.

• Use an appropriate jointing compound for pointing.

• Consider applying a sealant for additional protection.

 

Care & Maintenance

To protect and maintain your paving:

• Regularly sweep to remove debris, especially during autumn.

• Perform periodic washing with appropriate stone cleaners.

• Avoid harsh cleaning chemicals that may damage the stone.

• Consider sealing the paving to protect against staining.

• Clean spills promptly to prevent staining.

• Use low-pressure washing to avoid damaging the surface.

• Inspect and maintain joints regularly.

Â